Interwar building consolidation and refunctionalization S + P + 3E, Bucharest

PROJECT DESCRIPTION

PROJECT YEAR2014-2015
CATEGORYRESIDENTIAL
PROJECT STAGEFINISHING
LOCATIONNR. VASILE STROESCU STR. 6, S2 BUCHAREST
FLOOR AREA 134 m2
GROSS FLOOR AREA 542 m2

The project solves structural consolidation, refurbishment of the building, thermal rehabilitation, restoration of the snake and the coverings with the arrangement of the Circulable Bridge in the existing volumetry with the maintenance of the existing function, for the building of S (partly) + GF + 3E with 4 apartments in the central area of the capital.

The exterior thermal tyre has taken over all the defining geometric elements of the facades, presenting a meticulous and effective solution to the preservation of the original traits of the interwar modernist building.

For the enhancement of comfort have been adjusted some compartmentation schemes, introduced a lift of small persons in the building volume and additional sanitary groups.

PROJECTS SIMILAR